Post Offer Free
JinanG-HorizonInternationalTradeCompanyLimited  

Gold Index: 9677

You are here: home  > Self Loading Concrete Mixer Truck 4x2 6x4 8x4 With Eton Mixer Pump

Self Loading Concrete Mixer Truck 4x2 6x4 8x4 With Eton Mixer Pump 

Place of Origin: Zhejiang, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: ZZ1167N4617N

Self loading concrete mixer truck 4x2 6x4 8x4 5 to 18 cubic meters for Africa</s

Self loading concrete mixer truck 4x2 6x4 8x4 5 to 18 cubic meters for Africa

 

Specifications:

 

Vehicle Specifications Model concrete mixer truck for sale
  Traction 4X2,6X4,8X4 8X4
  Power 336HP
Weight Parameter Complete Vehicle Kerb Mass(kg) 15120
  Maximum authorized total mass (kg) 31000

Dimension

Parameter

External

Dimensions(mm)

Length (mm) 10745
    Width(mm) 2496
    Height(mm) 3190
  wheelbase(mm) 1800+3800+1350
  Drum Volumetric 14 cubic
  Drum Thickness(mm) 6

Performance

Parameter

Maximum Speed(km/h) 75
  Turning diameter(m) 16

Recommended

Configuration

Engine Engine Type WD615.69
   

Rated power

(kW)/Rev(r/min)

247/2200
  Transmission

Manual operation,

10 forward & 2reverse with

no synchronizer

  Axle Front Axle Payload(kg)
    Rear Axle Payload(kg)
  Fuel Tank(L)
  Track(mm)
  Front overhang/rear overhang(mm)
  Tire
Cabin

Standard cab with One sleeper,

with 4-point support fully floating suspension and shock absorbers, with air conditioner

OTHER ABS
  COLOR

 

 

Notes for New Vehicle Run-in
1. The run-in distance is set to be 2500 km. Before running in, conduct a routine check of the concrete mixer truck to ensure that the vehicle is in normal working condition.
2. After starting the engine, do not accelerate immediately. Wait for 3 to 5 minutes. After the normal operating temperature is reached, you can increase the engine speed.
3. It is strictly prohibited to shut down the engine in the state of warming car. You have to wait for 3 to 5 minutes before shutdown.
4. During the run-in period, the vehicle should run on flat roads.
5. You should shift the gears timely. Smoothly engage the clutch. Avoid sudden acceleration and emergency braking.
6. Before going up the slope, shift into the low speed level. But note that do not let the engine work at very low speeds.
7. In the first 3000km driving distance of the new vehicle, the vehicle load should not exceed 70% of the rated load. The lubrication and maintenance cycle should be shortened in the break-in period.

Contact us

Danny Xi

Marketing Manager

Mobile/Whatsapp:008613011707382

Skype:xiliang999

 

 

bigPhoto
 Mr. Mr. qi

Tel: 86-531-87993002
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

JinanG-HorizonInternationalTradeCompanyLimited [China (Mainland)]


Business Type:Manufacturer
City: Jinan
Province/State: Shandong
Country/Region: China (Mainland)

You May Like:

Product (194)